487

I

Average costs

of

13th January 1886.

>

Water Works Jummel.

Conduits for Liverpool, Manchester and Tytam, Hong Kong-

The tunnels are through mountains of hard rock, of great lengths - one to three miles, and are worked, or have to be worked without intermediate shafts.

The cross-sectional dimensions are similar, namely, 7'0" x 7'0".

Liverpool Water Works - as completed.

Cost per lineal yard.

$8.0.0

Manchester Water Works.

Price per lineal yard.

$10.0

$14.40

When lined with brick or masonry.

Hong Kong. Tytam.

Average cost up to August, 1885.

$23.2.0

The Liverpool headings have the bottom of the conduit worked to an even and true gradient.

The Manchester Tunnel headings, where in sound rock, are to have the bottoms brought to a smooth and even grade throughout.

Where the headings require to be lined with brick or stone, the area excavated is to be 8'6" by 8'6" to allow of a finished area equal to 7'0" x 7'0".

The bottom of the Tytam heading has not been dressed to an even surface as yet.

The dimensions are 6'x7'. This reduction of one foot in width, however, makes little difference in the cost.

Lineal yards Tytam Tunnel 2,433 Liverpool Tunnel 5,280 Manchester Tunnels 3,040 419 165 St

Edit History

2026-05-25 08:08:33 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
487 I Average costs of 13th January 1886. > Water Works Jummel. Conduits for Liverpool, Manchester and Tytam, Hong Kong- The tunnels are through mountains of hard rock, of great lengths - one to three miles, and are worked, or have to be worked without intermediate shafts. The cross-sectional dimensions are similar, namely, 7'0" x 7'0". Liverpool Water Works - as completed. Cost per lineal yard. $8.0.0 Manchester Water Works. Price per lineal yard. $10.0 $14.40 When lined with brick or masonry. Hong Kong. Tytam. Average cost up to August, 1885. $23.2.0 The Liverpool headings have the bottom of the conduit worked to an even and true gradient. The Manchester Tunnel headings, where in sound rock, are to have the bottoms brought to a smooth and even grade throughout. Where the headings require to be lined with brick or stone, the area excavated is to be 8'6" by 8'6" to allow of a finished area equal to 7'0" x 7'0". The bottom of the Tytam heading has not been dressed to an even surface as yet. The dimensions are 6'x7'. This reduction of one foot in width, however, makes little difference in the cost. Lineal yards Tytam Tunnel 2,433 Liverpool Tunnel 5,280 Manchester Tunnels 3,040 419 165 St
Baseline (Original)
t 487 I Average costs of 13th January 1886. > Water Works Jummel. Conduits for Liverpool, Manchester and Tytam, Hong Kong- The tunnels are through mountains of hard rock, of great lengths - one to three miles, and are worked, or have to be worked without intermediate shafts. The cross-sectional dimensions are Liverpool Water Works - as completed. similar namely. 7"0" x 7.0" - Cost per lineal yard. $8..0..0 Manchester Water Works. us Let. Price per lineal yard $10.0 $1440. D When lined with brick or masonry. Hong Kong. Tytam. Average cost up to August, 1885. $23.2.0 The The Liverpool headings have the bottom of the conduct worked to an even and true gradient. The Manchester Tunnel headings where in sound rock, are to have the bottoms brought to a smooth and even grade throughout. Where the headings require to be lined with brick or stone the 6" area excavated is to be 8'..6" by 8'".. to allow of a finished area equal to "'"0" x 7'"0" _ The bottom of the Tytam heading has not been dressed to an even surface as yet. The dimensions are 6'x7'! This reduction of one foot in width, however, makes little difference in the cost- Sineal gardis Tytam Tunnel Liverpool Tunnel Manchester Junnels 2.433 5.280 5 165 3 .040 419 St Į
2026-05-25 08:08:33 · Baseline
View content

t

487

I

Average costs

of

13th January 1886.

>

Water Works Jummel.

Conduits for Liverpool, Manchester

and Tytam, Hong Kong-

The tunnels are through mountains of hard rock, of great lengths - one

to three miles, and are worked, or

have to be worked without intermediate

shafts.

The cross-sectional dimensions are

Liverpool Water Works - as completed.

similar namely. 7"0" x 7.0" -

Cost per lineal yard.

$8..0..0

Manchester Water Works.

us Let.

Price

per

lineal

yard

$10.0

$1440. D

When lined with brick or masonry.

Hong Kong. Tytam.

Average cost up to August, 1885.

$23.2.0

The

The Liverpool headings have

the bottom of the conduct worked to an even and true gradient.

The Manchester Tunnel headings

where in sound rock, are to have the

bottoms brought to a smooth and

even grade throughout.

Where the headings require to

be lined with brick or stone the

6"

area excavated is to be 8'..6" by 8'".. to allow of a finished area equal to "'"0" x 7'"0" _

The bottom of the Tytam

heading has not been dressed to

an even surface as yet.

The

dimensions are 6'x7'! This reduction

of

one foot in width, however, makes little difference in the cost-

Sineal gardis

Tytam Tunnel

Liverpool Tunnel

Manchester Junnels

2.433

5.280

5

165

3 .040

419

St

Į

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.